Test and Commissioning

Test and Commissioning

Transformer Test and Maintenance Services

Considering that the average operational life of the transformers, which are widely used today in all kinds of industrial or distribution facilities, are between 20 and 30 years, periodical maintenance of transformers is great importance for the continuity of the plants. Our services about Transformer Tests;

  • Turn Ratio Tests
  • Winding Resistance Tests
  • DC Insulation Tests
  • Power Factor Measurement
  • Excitation Current Measurement
  • SFRA (Sweep Frequency Response Analysis) Tests
  • Transformer Oil Analyses
  • Transformer Oil Treatment
  • Repair Transformer Oil Leakages
  • General Cleaning of Transformer
  • Retouch or Full Transformer Painting
  • Screw(Bolt) Torque Control
  • Transformer Sound Level Measurement
LV/MV Cable Test Services

As Jaka Energy, we provide all kinds of testing services like installation, acceptance and maintenance for energy cables which are one of the most important equipment of electricity transmission. Our services about Cable Tests;

  • Low and Medium Voltage Cable VLF (Very Low Frequency) Hi-Pot Tests
  • Low and Medium Voltage Cable Fault Locator Tests
  • Medium Voltage Cable Tangent Delta Tests
  • Medium Voltage Cable Partial Discharge Tests
  • DC Insulation Tests
  • Medium Voltage Cable Shield Tests
Primary  Equipment Tests, Commissioning and Maintenance Services

As Jaka Energy, we provide commissioning, tests and maintenance services for primary equipment like Gas Insulated Switching Centres (GIS), Air Insulated Switchgear Centres (AIS), Natural Gas Combined Cycle Power Plant, Hydroelectric Power Plant (HEPP), Solar Power Plant (SPP), Geothermal Power Plant (GTPP) and Thermal Power Plants. Our services about Primer Equipment Tests;

  • Surge Protector Tests
  • Neutral Resistance Tests
  • Power Transformer Turns Ratio Tests
  • Power Transformer Winding Resistance Tests
  • Power Transformer DC Insulation Tests
  • Power Transformer Power Factor, Capacitance and Tan Delta Measurement
  • Power Transformer Excitation Current Measurement
  • Power Transformer SFRA (Sweep Frequency Response Analysis) Tests
  • Voltage Transformer Turn Ratio Tests
  • Voltage Transformer Winding Resistance Tests
  • Voltage Transformer DC Insulation Tests
  • Voltage Transformer Power Factor, Capacitance and Tan Delta Measurement
  • Voltage Transformer Excitation Current Measurement
  • Voltage Transformer SFRA (Sweep Frequency Response Analysis) Tests
  • Current Transformer Turn Ratio Tests
  • Current Transformer Winding Resistance Tests
  • Current Transformer DC Insulation Tests
  • Current Transformer Power Factor, Capacitance and Tan Delta Measurement
  • Current Transformer Excitation Current Measurement
  • Current Transformer SFRA (Sweep Frequency Response Analysis) Tests
  • Circuit Breaker Tests
  • Breaker-Separator Contact Resistance Measurement
  • DC Voltage Control
Secondary  Equipment Tests, Commissioning and Maintenance Services

As Jaka Energy, we provide commissioning, tests and maintenance services for secondary equipment like Gas Insulated Switching Centres (GIS), Air Insulated Switchgear Centres (AIS), Natural Gas Combined Cycle Power Plant, Hydroelectric Power Plant (HEPP), Solar Power Plant (SPP), Geothermal Power Plant (GTPP) and Thermal Power Plants. Our services about Secondary Equipment Tests;

  • Distance Protection Relay Settings and Tests
  • Over-Current Relay Settings and Tests
  • Differential Relay Settings and Tests
  • Frequency Relay Settings and Tests
  • Voltage Relay Settings and Tests
  • Directional Over-Current Relay Settings and Tests
  • Under/Over Voltage Relay Settings and Tests
  • Reverse Phase Relay Settings and Tests
  • AVR Panel Settings and Tests
  • Tank Protection, Buchholz Protection, Thermal Protection Tests
  • UPS Systems
Earth/Ground System Test Services

Grounding is to eliminate dangerous voltages (like Step Contact Voltages) completely. In order to secure the continuity of the electrical systems and the human life, the electrical parts are insulated. It is inevitable that an error occurs in the form of deterioration or puncture due to various reasons in the insulation against earth. In such an error, the measurement of grounding resistance must be carried out periodically to secure human life. Our services about Earth System Tests;

  • Specific Earth Resistance Measurement
  • Plant Earth Resistance Measurement
  • Equipment Earth Resistance Measurement
  • Lightning Rode Earth Resistance Measurement
  • Earth Resistance Measurement with SELVAZ (Selected Voltage-Ampere-Impedance) Method
  • Step Voltage Measurement
Supervision Services

As Jaka Energy, we provide Supervision Service for factory acceptance and field tests of High Voltage Switch-gear Equipment.